  • Jack H. Lucas (DDG 125) completes Bravo Trials 
March-April
  • Harrisburg (LPD 30) achieves 75% erect
  • NSC 10 Calhoun (WMSL 759) achieves main engine light-off
  • Harrisburg (LPD 30) achieves 75% weld out
  • Jeremiah Denton (DDG 129) achieves 25% weld out
  • Pittsburgh (LPD 31) keel is authenticated
  • Richard M. McCool Jr. (LPD 29) achieves main engine light-off
  • Lenah Sutcliffe Higbee (DDG 123) sails away
  • Jeremiah Denton (DDG 129) machinery is loaded
  May-June
  • NSC 10 Calhoun (WMSL 759) achieves gas turbine light-off, starts Dock Trials, and completes Builder’s Trials
  • Jack H. Lucas (DDG 125) completes Acceptance Trials, inclining, and delivery
  • Bougainville (LHA 8) achieves 100% erect
  • Jeremiah Denton (DDG 129) achieves 50% erect
  July-August
  • NSC 10 Calhoun (WMSL 759) completes Acceptance Trials and inclining
  • Ted Stevens (DDG 128) completes launch and is christened
  • Harrisburg (LPD 30) achieves stern release
  • Zumwalt (DDG 1000) arrives
  • Jeremiah Denton (DDG 129) achieves 75% erect
  • Bougainville (LHA 8) achieves 100% weld out
  September-October
  • Ted Stevens (DDG 128)achieves AC light-off
  • Bougainville (LHA 8) launches
  • Richard M. McCool Jr (LPD 29) completes Dock Trials and Builder’s Trials
  • Fallujah (LHA 9) keel is authenticated
  • Jack H. Lucas (DDG 125) sails away
  • Jeremiah Denton (DDG 129) achieves 50% weld out
  • NSC 10 Calhoun (WMSL 759) is delivered and sails away
  November-December
  • Jeremiah Denton (DDG 129) achieves 75% weld out
  • Thad Cochran (DDG 135) start fabrication
  • George M. Neal (DDG 131) keel is authenticated
  • Bougainville (LHA 8) is christened
  • Ted Stevens (DDG 128) completes waterborne alignment
  • Jeremiah Denton (DDG 129) integration complete
  • Zumwalt (DDG 1000) is docked
  Contracts Awarded
  • Zumwalt-class advanced planning
  • Philadelphia (LPD 32) detail design & construction
  • DDG(X) ship design
  • Multi-year contract for seven Destroyers
  • Zumwalt (DDG 1000) modernization
  • DDG 51-class follow yard support
  • LHA 10 long lead time material
 